banner

Commercial

Commercial

1 Details of Client NATIONAL COMMODITIES & DERAVITIES EXCHANGE LTD
Exchange Plaza, Bandra Kurla Complex, Bandra (East), Mumbai – 51.
Site Address As Above
Project Details Electrical Installation and allied work at BKC Site.
Project Architect M/s. Adharsila
C-403, Rizvi Nagar, S.V. Road, Santacruz (West),

Mumbai – 54.

Associated Consulting Engineers (Electrical ) M/s. RCUBE
Unit No. – 4, Shipoy Building – 124, Mathuradas Mill Compound, Senapati Bapat Marg, Near Ideal Industrial Estate, Lower Parel, Mumbai – 13.
Value of Contract Rs : 1,59,00,000.00
  Value of Work Done Rs : 1,97,96,455.70
  Stipulated Time 6 Weeks
  Year of Commencement 2003 – 2004
 
2 Details of Client NATIONAL COMMODITIES & DERAVATIVES EXCHANGE LIMITED
  Gr. Flr, Exchange Plaza, BKC, Bandra (East), Mumbai – 51.
  Site Address National Commodities & Deravatives Exchange Limited.
  2nd Floor, Jeevan Vihar, New Delhi
  Project Details Electrical Installation and allied work at NCDEX, New Delhi.
  Project Designer Rent Works India Pvt. Ltd.
  IL & FS Financial Center, Third Floor, Quadrant – A, BKC, Bandra (East), Mumbai – 51.
  Project Architect M/s. SMS Design
  C-403, Rizvi Nagar, S.V. Road, Santacruz (West), Mumbai – 54.
  Associated Consulting M/s. RCUBE
  Engineers ( Electrical ) Unit No. – 4, Shipoy Building – 124, Mathuradas Mill Compound, Senapati Bapat Marg, Near Ideal Industrial Estate, Lower Parel, Mumbai – 13
  Value of Contract Rs : 53,00,000.00
  Value of Work Done Rs : 70,35,657.52
  Stipulated Time 4 Weeks
  Year of Commencement 2005 – 2006
 
3 Details of Client NATIONAL COMMODITIES & DERAVATIVES EXCHANGE LIMITED
  Gr. Flr, Exchange Plaza, BKC, Bandra (East), Mumbai – 51.
  Site Address National Commodities & Deravatives Exchange Limited. Chennai.
  Project Details Electrical Installation and allied work at Chennai Site.
  Project Designer Rent Works India Pvt. Ltd.
  Project Architect M/s. SMS Design
  C-403, Rizvi Nagar, S.V. Road, Santacruz (West), Mumbai – 54.
  Associated Consulting Engineers (Electrical ) M/s. RCUBE
  Unit No. – 4, Shipoy Building – 124, Mathuradas Mill Compound, Senapati Bapat Marg, Near Ideal Industrial Estate, Lower Parel, Mumbai – 13.
  Value of Contract Rs : 92,00,000.00
  Value of Work Done Rs : 1,51,36,939.00
  Stipulated Time 4 Weeks
  Year of Commencement 2005 – 2006
 
4 Details of Client NATIONAL COMMODITIES & DERAVATIVES EXCHANGE LIMITED.
  Exchange Plaza, Bandra Kurla Complex, Bandra (East), Mumbai – 51.
  Site Address Gold Arcade Building, Top Floor,
  Opp. Curewell Hospital, Jangir Chowk, New Balasia Road, Indore.
  Project Details Electrical Installation and allied work for NCDEX – Indore site
  Project Architect M/s. SMS Design
  C-403, Rizvi Nagar, S.V. Road, Santacruz (West), Mumbai – 54.
  Associated Consulting Engineers (Electrical ) M/s. RCUBE
  Unit No. – 4, Shipoy Building – 124, Mathuradas Mill Compound, Senapati Bapat Marg, Near Ideal Industrial Estate, Lower Parel, Mumbai – 13.
  Value of Contract Rs : 38,91,000.00
  Value of Work Done Rs : 41,87,795.50
  Stipulated Time 6 Weeks
  Year of Commencement 2005 – 2006
 
5 Details of Client CREDIT SUISSE FIRST BOSTON (INDIA) SECURITIES PVT. LTD.
  94, Free Press House, Free Press Journal Marg, Nariman Point, Mumbai – 400 021.
  Site Address Ceejay House, Level 9, Worli, Mumbai.
  Project Details Electrical Installation and allied work for Ceejay House, Worli
  Project Management Consultant M/s. C B Richard Ellis South Asia Pvt. Ltd.
  9A, 2nd Floor, Tower “C”, Laxmi Tower, Bandra Kurla Complex, Bandra (East), Mumbai  – 400 051.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 1,86,79,202.00
  Value of Work Done Rs : 1,66,14,031.52
  Stipulated Time 4 Weeks
  Year of Commencement 2006 – 2007
 
6 Details of Client NATIONAL COMMODITIES & DERAVITIVES EXCHANGE LIMITED.
  Exchange Plaza, Bandra Kurla Complex, Bandra (East)
  Site Address National Commodities & Deravitives Exchange Limited.
  4th Floor, Geetanjali Tower, Ajmer Road, Jaipur (Rajasthan)
  Project Details Electrical Installation, DG Set, and Security Sytem work at NCDEX, Jaipur.
  Project Architect M/s. SMS Design
  C-403, Rizvi Nagar, S.V. Road, Santacruz (West), Mumbai – 54.
  Associated Consulting Engineers (Electrical ) M/s. RCUBE
  Unit No. – 4, Shipoy Building – 124, Mathuradas Mill Compound, Senapati Bapat Marg, Near Ideal Industrial Estate, Lower Parel, Mumbai – 13.
  Value of Contract Rs : 35,61,306.00
  Value of Work Done Rs : 36,79,636.83
  Stipulated Time 5 Weeks
  Year of Commencement 2006 -2007
 
7 Details of Client GE CAPITAL SERVICES INDIA
  GE Commercial Finance, Block 4A, DLF Coporate Park, Qutab Enclave Phase III, Mehrauli – Gurgaon Road, Gurgaon – 122 022. Haryana.
  Site Address GE Commercial Finance.
  503, “Windsor” 5th Floor, Village Kole Kalyan, Off C.S.T Road, Vidyanagari Marg, Kalina, Santacruz (East), Mumbai – 98.
  Project Details Electrical Installation and Allied work at GE Commercial Finance.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Value of Contract Rs : 24,19,728.26
  Value of Work Done Rs : 30,60,878.72
  Stipulated Time 7 Weeks
  Year of Commencement 2007-2008
 
8 Details of Client NATIONAL STOCK EXCHANGE INDIA LIMITED
  ‘Exchange Plaza’, Bandra Kurla Complex, Bandra (East), Mumbai – 51. India.
  Site Address National Stock Exchange India Limited
  Jeevan Vihar, Forth Floor, Parliament Street, New Delhi – 110 001.
  Project Details Electrical Installation and allied work for NSEIL – Delhi.
  Project Architect M/s. Adharshila.
  C-403, Rizvi Nagar, S.V. Road, Santacruz (West), Mumbai – 400 064
  Associated Consulting Engineers (Electrical) M/s. Siddhi Consultant
  Dimple Arcade, Office No. 502, Asha Nagar, Kandivali (East), Mumbai – 400 101
  Value of Contract Rs : 1,03,86,936.00
  Value of Work Done Rs : 1,27,53,806.29
  Stipulated Time 6 Weeks
  Year of Commencement 2007 – 2008
 
9 Details of Client EARNEST & YOUNG PVT. LTD.
  Jalan Mills Compound, 95, Ganpatrao Kadam Marg, Lower Parel, Mumbai (West), Mumbai – 400 013.
  Site Address As above
  Project Details Electrical Installation and allied work for Earnst & Young Ltd.
  Project Management Consultant M/s. IL & FS Property Management & Service Limited.
  First Floor, Asha House, 28, Suren Road, Andheri (East), Mumbai – 400 093.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 73,50,000.00
  Value of Work Done Rs : 9,42,7390.00
  Stipulated Time 6 Weeks
  Year of Commencement 2007 – 2008
 
10 Details of Client NATIONAL COMMODITIES & DERAVITIVES EXCHANGE LIMITED
  “Exchange Plaza”, Ground Floor, Bandra Kurla Complex, Bandra (East), Mumbai – 51. India.
  Site Address “Exchange Plaza”, 4th Floor, Bandra Kurla Complex,
  Bandra (East), Mumbai – 51. India.
  Project Details Electrical Installation and allied work for NCDEX – 4th Floor.
  Project Architect M/s. Adharshila.
  C-403, Rizvi Nagar, S.V. Road, Santacruz (West), Mumbai – 400 064
  Value of Contract Rs : 62,50,000.00
  Value of Work Done Rs : 26,33,586.00
  Stipulated Time 6 Weeks
  Year of Commencement 2007 – 2008
 
11 Details of Client SOCIETY FOR WORLDWIDE INTERBANKING FEDERATION OF TELECOMMUNICATION (SWIFT)
  Site Address 3rd floor, Unit no. 303, Ceejay House, Opp. Atria Mall, Worli, Mumbai
  Project Details Electrical Work, Fire Alarm System, Public Address System, UPS System for S.W.I.F.T. at Worli
  Project Architect Anurup Designs Pvt. Ltd.
  11/175, Mahalaxmi Bldg No.3, Sir Balhandra Road, Hindu colony, Dadar (E), Mumbai-400 014.
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract 1,33,77,660.00
  Stipulated Time 6 Weeks
  Year of Commencement 2007 – 2008
 
12 Details of Client NATIONAL COMMODITIES & DERIVATIVES EXCHANGE LTD.
  Exchange Plaza, Bandra Kurla Complex, Bandra (East), Mumbai – 51.
  Site Address National Commodities & Derivative Exchange Ltd.
  1st floor, Akruti Corporate Park, Nr. Navy Colony, L.B.S. Marg, Kanjurmarg (W), Mumbai – 72
  Project Details Electrical Work, Fire Alarm System, Public Address System, Access Control, CCTV for NCDEX Ltd. – Kanjurmarg.
  Project Architect M/s. Adharshila
  C-403, Rizvi Nagar, S.V. Road, Santacruz (West), Mumbai – 400 064
  Associated Consulting Engineers (Electrical) N. K. Jain Consulting Engineers
  1002, Kritika Tower, Nr. R. K. Studio, Sion Trombay Road, Chembur, Mumbai – 71
  Value of Contract Rs. 3,79,00,000.00
  Stipulated Time 10 Weeks
  Year of Commencement 2007 – 2008
 
13 Details of Client EARNST & YOUNG PVT. LTD.
  Jalan Mills Compound, 95, Ganpatrao Kadam Marg, Lower Parel, Mumbai (West), Mumbai – 400 013.
  Site Address As above – for 2nd Floor
  Project Details Electrical Installation and allied work for Earnst & Young Ltd.
  Project Management Consultant M/s. IL & FS Property Management & Service Limited.
  First Floor, Asha House, 28, Suren Road, Andheri (East), Mumbai – 400 093.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract 65,89,701.00
  Stipulated Time 6 Weeks
  Year of Commencement 2007 – 2008
 
14 Details of Client VIJAY ASSOCIATES ( WADHWA)
  Site Address 6th & 7th Floor, Platina Tower, Bandra Kurla Complex, Bandra (East), Mumbai.
  Project Details Electrical Installation & Allied Work
  Project Management Consultant Equis India Pvt. Ltd.
  304, Jaisingh Business Center, Sahar Road, Andheri (East), Mumbai – 99.
  Project Architect Nat Engineering Consultant.
  808, Boman Lodge, Flat No. 101, 1st Floor, Near Bata Showroom, Khodadad Circle, Dadar East, Mumbai – 400 014.
  Associated Consulting Engineers (Electrical) Ajit Kulkarni Consultants Pvt. Ltd.
  27, Haria Industrial Estate, Behind Paper Product, Maziwade, Thane (West), Mumbai – 400 601.
  Value of Contract Rs : 58,30,240.00
  Stipulated Time 6 Weeks.
  Year of Commencement 2009 – 2010
 
15 Details of Client VIJAY ASSOCIATES ( WADHWA)
  Site Address 4th Floor, Platina Tower, Bandra Kurla Complex, Bandra (East), Mumbai.
  Project Details Electrical Installation & Allied Work
  Project Management Consultant Equis India Pvt. Ltd.
  304, Jaisingh Business Center, Sahar Road, Andheri (East), Mumbai – 99.
  Project Architect M/s. Karim Noorani & Company.
  801 – B, Sagar Tech Plaza, Andheri Kurla Road, Sakinaka, Andheri (East), Mumbai -72.
  Associated Consulting Engineers (Electrical) Nat Engineering Consultant.
  808, Boman Lodge, Flat No. 101, 1st Floor, Near Bata Showroom, Khodadad Circle, Dadar East, Mumbai – 400 014.
  Value of Contract Rs : 12,71,942.00
  Stipulated Time 6 Weeks.
  Year of Commencement 2009 – 2010
 
16 Details of Client MASTEK LIMITED.
Site Address M/s Mastek Limited,
Unit No 183, 2nd floor, SDF VI,SEEPZ, Andheri(E), Mumbai 400 093
Project Electrification work for Software Development Centre.
Project Architect & Designer. Edifice / Yatin Patel & Associates.
Value of work Rs 1,00,00,000=00
Stipulated Time 29 Weeks
  Year of Commencement 1998 – 1999
 
17 Details of Client INFORMIX SOFTWARE (INDIA) PVT. LTD.
Unit No 184, SDF VI, SEEPZ, Andheri (E), Mumbai-93
Site Address M/s Informix Software (India) Pvt. Ltd.
Unit No 184, SDF VI, SEEPZ, Andheri (E), Mumbai-93
Project Electrification Installation & Allied work Signal Cabling, Telephone Network & Music  System, Lightening  Fixture, Earthing, Trunking, Main L.T. Panel, PCC & PDB’s & P.A. System
Project Architect & Designer. DSP  Design Associates Pvt. Ltd.
5th Floor, Rahimtulla, 7,Homji Street, Fort,Mumbai – 1
Consultant (Electrical) M/s V. Ramachandran Associates
Value of work Rs 12,68,000=00
Stipulated Time 6 Weeks
  Year of Commencement 1999 – 2000
 
18 Details of Client MASTEK LIMITED
Mahape Millenium Park, A-7 Building, Navi Mumbai.
Site Address Mastek Limited
Seepz, Andheri (East), Mumbai.
Project Details Electrical Installation work for various software facility at Seepz
Project Architect M/s. Edifice Architects Pvt. Ltd.
3rd Floors, Srirams Arcade, Opp. Govandi Post Office, Govandi (East), Mumbai – 88.
Associated Consulting Engineers (Electrical) M/s. V Ramchandran & Associates
Agashe Path, 4A Francis Mansion, Dadar,

Mumbai – 28

Value of Contract Rs : 91,79,785.00
Value of Work Done Rs : 95,14,485.73
Stipulated Time 24 Weeks
Year of Commencement 1999 – 2001
 
19 Details of Client iDLX TECHNOLOGY PARTNERS PVT. LTD.
Call Center – STPI, Unit No. 4th & 5th Floor, Infinity Mind Space, 504 New Link Road, Chincholi, Malad (West), Mumbai.
Site Address As Above.
Project Details Electrical Installation and Allied work for Call Center.
Project Architect M/s. Edifice Architects Pvt. Ltd.
3rd Floors, Srirams Arcade, Opp. Govandi Post Office, Govandi (East), Mumbai – 88.
Associated Consulting Engineers (Electrical) M/s. V Ramchandran & Associates
Agashe Path, 4A Francis Mansion, Dadar, Mumbai- 28
Value of Contract Rs : 1,90,00,000.00
Value of Work Done Rs : 1,90,68,395.20
Stipulated Time 8 Weeks
Year of Commencement 2000 – 2001
 
20 Details of Client ICICI INFOTECH SERVICES LIMITED
    Zenith House, Keshav Rao Khade Marg, Mahalaxmi, Mumbai – 34.
  Site Address ICICI Infotech Services Limited
  3rd/4th/5th/6th Floor, Tower 5, International Infotech Park, Vashi Railway Station, Vashi Navi Mumbai.
  Project Details Electrical Installation work for IT office at Vashi.
Project Architect M/s. Sankalpan Architect Pvt. Ltd.
1st Floor, Barkha Babar, M.G.Road, Thane – 400 602.
Associated Consulting Engineers (Electrical) M/s. V Ramchandran & Associates
Agashe Path, 4A Francis Mansion, Dadar, Mumbai – 28
Value of Contract Rs : 1,02,00,000.00
Value of Work Done Rs : 89,44,257.52
Stipulated Time 10 weeks
Year of Commencement 2000 – 2001
 
21 Details of Client LUCENT TECHNOLOGIES HINDUSTAN PVT. LTD.
Ground Floor, Golf View Campus, Wind Tunnel Road, Bangalore – 560 017.
Site Address LUCENT TECHNOLOGIES HINDUSTAN PVT. LTD.
Unit No. 1, 3rd Floor, B Wing, Exchange Plaza, Plot No. C – 1, Gn Block, Bandra Kurla Complex, Mumbai – 51.
Project Details Electrical Installation and allied work at BKC.
Project Management Consultant M/s. Framework Interiors
12, Patel Seethapa Colony, New Thippasandra, Bangalore.
Project Architect M/s. DSP Design Associate Pvt. Ltd.
5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
Value of Contract Rs : 24,75,000.00
Value of Work Done Rs : 29,18,341.00
Stipulated Time 7 Weeks
Year of Commencement 2003 – 2004
 
22 Details of Client MPHASIS BFL LIMITED
    2nd Floor, The Leela Business Park, Andheri Kurla Road, Andheri (East), Mumbai  – 59
  Site Address As Above
  Project Details Electrical Installation and allied work at Andheri site.
  Project Architect M/s. Karim Noorani & Company.
  801 – B, Sagar Tech Plaza, Andheri Kurla Road, Sakinaka, Andheri (East), Mumbai -72.
  Associated Consulting Engineers (Electrical) M/s. Tarun Barai Consultants
  303, Flyover Apartments, G. K. Gokhale Road, Near Flyover Bridge, Andheri (East), Mumbai – 69.
Value of Contract Rs : 29,40,311.00
Value of Work Done Rs : 25,10,762.00
Stipulated Time 4 Weeks
Year of Commencement 2003 – 2004
 
23 Details of Client MPHASIS BFL LIMITED
    2nd Floor, The Leela Business Park, Andheri Kurla Road, Andheri (East), Mumbai  – 59
Site Address As Above
Project Details Electrical Installation and allied work at Andheri site.
Project Architect M/s. Karim Noorani & Company.
801 – B, Sagar Tech Plaza, Andheri Kurla Road, Sakinaka, Andheri (East), Mumbai -72.
Associated Consulting Engineers (Electrical) M/s. Tarun Barai Consultants
303, Flyover Apartments, G. K. Gokhale Road, Near Flyover Bridge, Andheri (East), Mumbai – 69.
Value of Contract Rs : 37,85,000.00
  Value of Work Done Rs : 37,64,126.98
  Stipulated Time 4 Weeks
  Year of Commencement 2003 – 2004
 
24 Details of Client RED HAT INDIA
  6th Floor, Mari Soft Building, Mari Gold Premises, Kalyani Nagar, Pune.
  Site Address As above.
  Project Details Electrical Installation and allied work at Red Hat – Pune.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 1.
  Associated Consulting Engineers (Electrical) M/s. M. P. Cardoz & Associate.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 78.
  Value of Contract Rs : 87,00,000.00
  Value of Work Done Rs : 94,16,654.00
  Stipulated Time 12 Weeks
  Year of Commencement 2004 – 2005
 
25 Details of Client CALIBER POINT BUSINESS SOLUTION
  Building No. 152, Sector – III, MBP, TTC Industrial Area, Navi Mumbai
  Site Address As Above
  Project Details Electrical Installation and allied work at Caliber Mahape site.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. M. P. Cardoz & Associate.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 45,00,000.00
  Value of Work Done Rs : 45,33,783.00
  Stipulated Time 9 Weeks
  Year of Commencement 2004 -2005
 
26 Details of Client NORTEL NETWORK
  # 695, 9th ‘A’ Main Road, 1st Stage, Indiranagar, Bangalore – 38.
  Site Address Nortel Network
  Ground Floor, P & G Plaza, Cardinal Gracious Road, Chakala, Andheri (East), Mumbai – 99
  Project Details Electrical Installation and allied work at Nortel Network – Mumbai
  Project Designer Artizen Interior Pvt. Ltd.
  Project Management Consultant M/s. C B Richard Ellis South Asia Pvt. Ltd.
  9A, 2nd Floor, Tower “C”, Laxmi Tower, Bandra Kurla Complex, Bandra (East),Mumbai  – 400 051
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001
  Associated Consulting Engineers (Electrical) M/s. RCUBE
  Unit No. 4, Shipoy Building, Mathuradas Mill Compd, Senapati Bapat Marg, Nr Ideal Indl Estate, Lower Parel, Mumbai – 13.
  Value of Contract Rs : 56,24,917.00
  Value of Work Done Rs : 57,24,989.60
  Stipulated Time 6 Weeks
  Year of Commencement 2005 – 2006
 
27 Details of Client NORTEL NETWORK
  # 695, 9th ‘A’ Main Road, 1st Stage, Indiranagar, Bangalore – 38.
  Site Address Nortel Network
  Orchid Plaza, Second Floor, Sun City, Gurgaon, Haryana
  Project Details Electrical Installation and allied work at Nortel Network – Gurgaon
  Project Designer Artizen Interior Pvt. Ltd.
  Project Management Consultant M/s. C B Richard Ellis South Asia Pvt. Ltd.
  9A, 2nd Floor, Tower “C”,Laxmi Tower, Bandra Kurla Complex, Bandra (East),Mumbai  – 400 051
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. RCUBE
  Unit No. 4, Shipoy Building, Mathuradas Mill Compd, Senapati Bapat Marg, Nr Ideal Indl Estate, Lower Parel
  Value of Contract Rs : 76,95,109.00
  Value of Work Done Rs : 78,90,736.64
  Stipulated Time 8 Weeks
  Year of Commencement 2005 -2006
 
28 Details of Client NORTEL NETWORK
  # 695, 9th ‘A’ Main Road, 1st Stage, Indiranagar, Bangalore – 38.
  Site Address Nortel Network
  Adonis Salarpurai, Gr. Floor, Old Madras Road, Indira Nagar, Bangalore
  Project Details Electrical Installation and allied work at Nortel Network – Bangalore
  Project Designer Artizen Interior Pvt. Ltd.
  Project Management Consultant M/s. C B Richard Ellis South Asia Pvt. Ltd.
  9A, 2nd Floor, Tower “C”, Laxmi Tower, Bandra Kurla Complex, Bandra (East),Mumbai  – 400 051
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. RCUBE
  Unit No. – 4, Shipoy Building – 124, Mathuradas Mill Compound, Senapati Bapat Marg, Near Ideal Industrial Estate, Lower Parel, Mumbai – 13.
  Value of Contract Rs : 80,55,057.00
  Value of Work Done Rs : 82,24,549.88
  Stipulated Time 8 Weeks
  Year of Commencement 2005 -2006
 
29 Details of Client NORTEL NETWORK
  # 695, 9th ‘A’ Main Road, 1st Stage, Indiranagar, Bangalore – 38.
  Site Address Nortel Network
  Infinity Building, 12th Floor, Plot No. A3,  Block GP, Sector V, Salt Lake, Kolkatta.
  Project Details Electrical Installation and allied work at Nortel Network – Kolakatta
  Project Designer Artizen Interior Pvt. Ltd.
  Project Management Consultant M/s. C B Richard Ellis South Asia Pvt. Ltd.
  9A, 2nd Floor, Tower “C”, Laxmi Tower, Bandra Kurla Complex, Bandra (East),Mumbai  – 400 051
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. RCUBE
  Unit No. – 4, Shipoy Building – 124, Mathuradas Mill Compound, Senapati Bapat Marg, Near Ideal Industrial Estate, Lower Parel, Mumbai – 13.
  Value of Contract Rs : 53,89,395.00
  Value of Work Done Rs : 53,02,365.56
  Stipulated Time 6 Weeks
  Year of Commencement 2005 – 2006
 
30 Details of Client CAPITA OFFSHORE SERVICES PVT. LTD.
  6th Floor, Hamilton – B, Hiranandani Business Park, Ghodbunder Road, Thane (W) – 400 607, Maharashtra.
  Site Address 5th Floor, Tower 1, Logitech Park,
  Andheri Kurla Road, Sakinaka, Andheri (East), Mumbai.
  Project Details Electrical Installation and allied work for Capita Offshores – Phase I
  Project Management Consultant M/s. C B Richard Ellis South Asia Pvt. Ltd.
  9A, 2nd Floor, Tower “C”, Laxmi Tower, Bandra Kurla Complex, Bandra (East),Mumbai  – 400 051
  Project Architect M/s. Concept Architectural Services Pvt. Ltd.
  711, Swastik Chambers, Sion – Trombay Road, Chembur, Mumbai 400 071.
  Associated Consulting Engineers (Electrical) M/s. Ajit N. Kulkarni.
  A/215, Amargian Co-Op Premises Society Limited, L.B.S Marg, Opp S. T Workshop, Khopat, Thane (West), – 400 601.
  Value of Contract Rs : 1,29,50,000.00
  Value of Work Done Rs : 1,47,43,196.00
  Stipulated Time 6 Weeks
  Year of Commencement 2005 – 2006
 
31 Details of Client QAD INDIA PRIVATE LIMITED
  Prism Tower, ‘A’ Wing, Unit No. 5, 3rd Floor, Mindspace, Goregaon Malad Link Road, Goregaon (West), Mumbai – 400 062.
  Site Address As Above
  Project Details Electrical Work, Fire Alarm System, Public Address System, Access Control, Networking CCTV, Sprinklers, UPS System for QAD Office.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. M. P. Cardoz & Associate.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078
  Value of Contract Rs : 62,46,280.00
  Value of Work Done Rs : 64,36,144.00
  Stipulated Time 4 Weeks
  Year of Commencement 2005 – 2006
 
32 Details of Client CALIBER POINT BUSINESS SOLUTION LTD
  3rd Floor, Millenium Business Park, Mahape, Navi Mumbai.
  Site Address Same as above
  Project Details Electrical Installation and allied work for Caliber Mahape, site.
  Project Architect M/s. Design Pundits
  Space Design Consultants, 7, Shanta Sadan, Pandurang Wadi Road No. 4, Goregaon (East), Mumbai – 63.
  Associated Consulting Engineers (Electrical) M/s. Avinash Raj & Associates
  002/A-15/AARTI/GOKULDHAM, Gen. A. K. Vaidya Marg, Goregaon (East), Mumbai – 64.
  Value of Contract Rs : 23,00,000.00
  Value of Work Done Rs : 22,29,525.73
  Stipulated Time 6 Weeks
  Year of Commencement 2006 – 2007
 
33 Details of Client CONEXANT SYSTEM S PRIVATE LIMITED
  503-504, Chiranjiv Towers, 43, Nehru Place. New Delhi – 110 019.
  Site Address Conexant System Pvt. Ltd.
  4th Floor, Devi House, 1576, Shivaji Nagar, Nr. Pride Hotel, Pune.
  Project Details Electrical Installation and allied work for Conexant system – Pune.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  No. 60, Lane 2, Anant Park, Aundh, Pune – 411 007
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 62,00,000.00
  Value of Work Done Rs : 68,28,801.60
  Stipulated Time 6 Weeks
  Year of Commencement 2006 – 2007
 
34 Details of Client MPHASIS LIMITED
  Bagmane Technology Park, Byrasandra, C. V. Raman Nagar, Bangalore – 560091
  Site Address Unit no. 101 & 102, Building no. 4, Infinity Park, Goregaon (W), Mumbai – 97
  Project Details Electrical Installation and allied work for EDS Mphasis Ltd.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract 6,00,00,000.00
  Stipulated Time 12 Weeks
  Year of Commencement 2007 – 2008
 
35 Details of Client TRINITY COMPUTERS PROCESSING (I) PVT. LTD.
  Site Address 2nd Floor, Akruti SMC IT Park, Next to MSRDC Bus Stand, Khopat, Thane.
  Project Details Electrical Installation & Allied Work
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract 1,12,00,000.00
  Stipulated Time 8 Weeks
  Year of Commencement 2008 – 2009
 
36 Details of Client TELEVISION EIGHTEEN INDIA LIMITED.
    Empire Mill Complex, Senapati Bapat Marg, Mumbai-13.
Site Address As above.
Empire Complex, Lower Parel.
Project Details Electrical Installation and allied work at Empire Complex.
Project Architect M/s. Edifice Architects Pvt. Ltd.
3rd Floors, Srirams Arcade, Opp. Govandi Post Office, Govandi (East), Mumbai – 88.
Associated Consulting Engineers (Electrical) M/s. MEP Consulting Engineers
A-11, Krishna CHS, Ltd, Opp. Gufic Lab. Near Garware House, Subhash Road – A, Vile Parel (East), Mumbai – 57.
  Value of Contract Rs : 70,00,000.00
  Value of Work Done Rs : 81,88,301.00
  Stipulated Time 8 Weeks
  Year of Commencement 2004 – 2005
 
37 Details of Client KODAK INDIA LIMITED
  2nd Floor, Kalpataru Synergy, Vakola, Santacruz (East), Mumbai – 29.
Site Address Kodak India Limited
2nd Floor, Kalpataru Synergy, Vakola, Santacruz (East), Mumbai – 29.
Project Details Electrical Installation and Allied work at Santacruz Site.
Project Manager M/s. Cushman & Wakefield (India) Pvt. Ltd.
Ground Floor, Mafatlal House, Padma Bhushan, H.T. Parekh Marg, Churchgate, Mumbai.
Associated Consulting Engineers (Electrical) M/s. DSP Design Associate Pvt. Ltd.
5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
Value of Contract Rs : 37,50,000.00
Value of Work Done Rs : 37,39,666.00
  Stipulated Time 8 Weeks
  Year of Commencement 2004 -2005
 
38 Details of Client MIDDAY MULTIMEDIA
  64, Sitaram Mills Compound, N. M. Joshi Marg, Lower Parel, Mumbai – 11.
  Site Address MIDDAY MULTIMEDIA, Peninsula Park,
  Parel, Mumbai – 12
  Project Details Electrical Installation and allied work at Lower Parel.
  Project Architect M/s. Edifice Architects Pvt. Ltd.
  3rd Floors, Srirams Arcade, Opp. Govandi Post Office, Govandi (East), Mumbai – 88.
  Associated Consulting Engineers (Electrical) M/s. Ajit N. Kulkarni.
  A/215, Amargian Co-Op Premises Society Limited, L.B.S Marg, Opp S. T Workshop, Khopat, Thane (West), – 400 601.
  Value of Contract Rs : 59,00,000.00
  Value of Work Done Rs : 66,25,891.00
  Stipulated Time 9 Weeks
  Year of Commencement 2004 – 2005
 
39 Details of Client HOMECARE RETAIL PVT. LTD.
  401, Nirman Kendra, Off. Dr. E. Moses Road, Mahalaxmi, Mumbai – 400 011, India.
  Site Address Homecare Retail Mart
  Matunga (West), Mumbai.
  Project Details Electrical Installation and allied work at Matunga west – Mall
  Project Architect M/s. Kapil Bakshi Architects
  6th Ground Floor, Dadar Yashodhan Society, B. S. Babarekar Marg, Off. Gokhale Road, Dadar (East), Mumbai – 28.
  Value of Contract Rs : 47,00,000.00
  Value of Work Done Rs : 57,43,210.00
  Stipulated Time 6 Weeks
  Year of Commencement 2005 – 2006
 
40 Details of Client CAPITA OFFSHORE SERVICES PVT. LTD.
  6th Floor, Hamilton – B, Hiranandani Business Park, Ghodbunder Road, Thane (W) – 400 607
  Site Address 5th Floor, Tower 1, Logitech Park,
  Andheri Kurla Road, Sakinaka, Andheri (East), Mumbai.
  Project Details Electrical Installation and allied work for Capita Offshores – Phase I
  Project Management Consultant M/s. C B Richard Ellis South Asia Pvt. Ltd.
  9A, 2nd Floor, Tower “C”, Laxmi Tower, Bandra Kurla Complex, Bandra (East),Mumbai  – 400 051
  Project Architect M/s. Concept Architectural Services Pvt. Ltd.
  711, Swastik Chambers, Sion – Trombay Road, Chembur, Mumbai 400 071.
  Associated Consulting Engineers (Electrical ) M/s. Ajit N. Kulkarni.
  A/215, Amargian Co-Op Premises Society Limited, L.B.S Marg, Opp S. T Workshop, Khopat, Thane (West), – 400 601.
  Value of Contract Rs : 1,29,50,000.00
  Value of Work Done Rs : 1,47,43,196.00
  Stipulated Time 6 Weeks
  Year of Commencement 2005 – 2006
 
41 Details of Client QAD INDIA PRIVATE LIMITED
  Prism Tower, ‘A’ Wing, Unit No. 5, 3rd Floor, Mindspace, Goregaon Malad Link Road, Goregaon (West), Mumbai – 400 062.
  Site Address As Above
  Project Details Electrical Work, Fire Alarm System, Public Address System, Access
  Control, Networking CCTV, Sprinklers, UPS System for QAD Office.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House,
  7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting M/s. M. P. Cardoz & Associate.
  Engineers ( Electrical ) Bharat Industrial Estate, Office No. 116,
  1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 62,46,280.00
  Value of Work Done Rs : 64,36,144.00
  Stipulated Time 4 Weeks
  Year of Commencement 2005 – 2006
 
42 Details of Client GLENMARK PHARMACEUTICALS LTD.
  B/2. Mahalaxmi Chambers, 22, Bhulabhai Desai Road,
  Post Box No. 26511. Mumbai – 26.
  Site Address Glenmark Pharmaceutical
  Andheri , Mumbai.
  Project Details Electrical Installation and allied work at Andheri site.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House,
  7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting M/s. M. P. Cardoz & Associate.
  Engineers ( Electrical ) Bharat Industrial Estate, Office No. 116,
  1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 91,25,000.00
  Value of Work Done Rs : 1,10,19,980.34
  Stipulated Time 6 Weeks
  Year of Commencement 2005 -2006
 
43 Details of Client EMGEEN HOLDINGS PVT. LTD.
  Dwarka, 57 Tagore Road,
  Santacruz (West),
  Mumbai – 54, India.
  Site Address Rolce Royce Marine India Pvt. Ltd.
  Office No. 3, 1st Floor, Windsor,
  Kalina, Santacruz (East), Mumbai.
  Project Details Electrical Installation and allied work at Rolce Royce – Kalina, Santacruz
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House,
  7 Homji Street, Fort, Mumbai – 400 001.
  Value of Contract Rs : 14,50,000.00
  Value of Work Done Rs : 13,08,850.09
  Stipulated Time 4 Weeks
  Year of Commencement 2005 – 2006
 
44 Details of Client PERPUTO CONTENT MANAGEMENT PRIVATE LIMITED
  14,15, Paradigm, ‘B’ 1st Floor, Mindspace, Link Road, Malad (West), Mumbai – 64.
  Site Address Perputo Content Management Pvt. Ltd.
  Unit No. 801, 8th Floor, Wing B, Prism Tower, Goregaon (West), Mumbai – 63.
  Project Details Electrical Installation and allied work for perputo office.
  Project Management Consultant M/s. Concept Architectural Services Pvt. Ltd.
  711, Swastik Chambers, Sion – Trombay Road, Chembur, Mumbai 400 071
  Project Architect M/s. Concept Architectural Services Pvt. Ltd. 711, Swastik Chambers, Sion – Trombay Road, Chembur, Mumbai 400 071. India.
  Associated Consulting Engineers (Electrical ) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 73,28,186.00
  Value of Work Done Rs : 63,61,496.67
  Stipulated Time 6 Weeks
  Year of Commencement 2006 – 2007
 
45 Details of Client CENTAUR PHARMACEUTICAL
  Centaur House, Gold Coin Complex, Vakola, Santacruz (East), Mumbai.
  Site Address 5th Floor – B Wing, & 6th Floor – A & B Wing,
  Vakola, Santacruz (East), Mumbai.
  Project Details Electrical Installation and allied work for Centaur House.
  Project Architect Mr. Vijay P. Dalvi.
  4/B. Nirmal, Plot No. 26, Jai Prakash Road, Andheri (West), Mumbai – 58.
  Associated Consulting Engineers (Electrical ) M/s. Tarun Barai Consultant
  303, Flyover Apartments, East End Flyover Bridge, Gopal Krishnan Gokhale Road, Andheri (East), Mumbai – 69.
  Value of Contract Rs : 30,84,000.00
  Value of Work Done Rs : 30,47,138.00
  Stipulated Time 6 Weeks
  Year of Commencement 2006 -2007
 
46 Details of Client THE TATA POWER COMPANY LIMITED
  GIS Building, at Carnac Receiving Station, Near Security Cabin, Sant Tukaram Road, Carnac Bunder, Mumbai – 09.
  Site Address The Tata Power Company Ltd.
  Strategic Electronics Divisions, at 42 Saki Vihar Road, Andheri (East), Mumbai – 72.
  Project Details Electrical Installation and allied work at Tata Power Company Ltd, Sakinaka
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical ) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 36,33,098.00
  Value of Work Done Rs : 40,35,125.88
  Stipulated Time 10 Weeks
  Year of Commencement 2006 – 2007
 
47 Details of Client ENERCON INDIA LIMITED
  Kolsite House, Plot No. 31, Shah Industrial Estate, Veera Desai Road, Andheri (West), Mumbai – 53.
  Site Address: Enercon India Limited.
  Enercon Tower, Plot No – A-9, C.T.S No. 700, Village Oshiwara, Off Link Road, Andheri (West), Mumbai – 58.
  Project Details: Electrical Installation and allied work for Enercon Tower.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical ) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 1,97,50,000.00
  Value of Work Done Rs : 2,38,44,522.00
  Stipulated Time 12 Weeks
  Year of Commencement 2006 – 2007
 
48 Details of Client GIA India Laboratories (P) Ltd.
  Site Address Trade Center, CTS No. 4207, Village Kolekalyan at Bandra (East), Mumbai.
  Project Details Electrical Installation & Allied Work, for GIA Laboratories at BKC.
  Project Management Consultant M/s. C B Richard Ellis South Asia Pvt. Ltd.
  #5, 3rd Floor, Tower C, Laxmi Towers, Bandra Kurla Complex, Bandra (East), Mumbai – 51.
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract 55,00,000.00
  Stipulated Time 10 Weeks
  Year of Commencement 2007 – 2008
 
49 Details of Client SIEMENS LTD.
  Site Address 13th Floor, Ascendas, Chennai.
  Project Details Electrical Installation & Allied Work, for Siemens Ltd at Chennai.
  Project Architect M/s. AVINASH RAJ & ASSOCIATE
  Unit No. 4, Shipoy Building, Mathuradas Mill Compd, Senapati Bapat Marg, Nr Ideal Indl Estate, Lower Parel, Mumbai – 13.
  Associated Consulting Engineers (Electrical) M/s. DESIGN PUNDITS INTERIOR PVT. LTD.
  72/3, Sri Krupa, Pandurang Wadi Road No. 2, Goregaon (East), Mumbai – 63.
  Value of Contract 56,51,738.00
  Stipulated Time 4 Weeks
  Year of Commencement 2007 – 2008
 
50 Details of Client SoftDEL System Pvt. Ltd.
  Site Address P4, Pentagon Tower, 3rd Floor, Block No. 301-304, Hadapsar, Pune.
  Project Details Electrical Installation & Allied Work, for SoftDEL System at Pune.
  Project Architect M/s. Concept Architectural Services Pvt. Ltd.
  711, Swastik Chambers, Sion-Trombay Road, Chembur Mumbai – 400 071, India.
  Associated Consulting Engineers (Electrical) M/s. E & M Consultants Pvt. Ltd.
  202, B Wing, Twin Arcade, Opp. Blossom Society, Military Road, Marol, Andheri (East), Mumbai.
  Value of Contract 53,00,000.00
  Stipulated Time 8 Weeks
  Year of Commencement 2007 – 2008
 
51 Details of Client VODAFONE ESSAR GROUP LIMITED.
  Site Address 7th Floor, Sakar II, Ellisbridge, Ahmedabad – 380 006
  Project Details Electrical Installation & Allied Work, for Vodafone House Call Center & Data Center at Ahmedabad.
  Project Architect M/s. DSP Design Associate Pvt. Ltd.
  5th Floor, Rahimtoola House, 7 Homji Street, Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract 7,32,,62,404.00
  Stipulated Time 13 Weeks
  Year of Commencement 2007 – 2008
 
52 Details of Client GIA India Laboratories (P) Ltd.
  Site Address Trade Center, CTS No. 4207, Village Kolekalyan at Bandra (East), Mumbai.
  Project Details Electrical Installation & Allied Work, for GIA Laboratories at BKC.
  Project Management Consultant M/s. C B Richard Ellis South Asia Pvt. Ltd.
  #5, 3rd Floor, Tower C, Laxmi Towers, Bandra Kurla Complex, Bandra (East), Mumbai – 51.
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract 2,84,00,000.00
  Stipulated Time 12 Weeks
  Year of Commencement 2008 – 2009
 
53 Details of Client FUTURE METALS INDIA PVT. LTD.
  Site Address Kanjurmarg
  Project Details Electrical Installation & Allied Work, for FTG at Kanjurmarg
  Project Architect M/s. Adharshila
  C-403, Rizvi Nagar, S.V. Road, Santacruz (West), Mumbai – 400 064
  Associated Consulting Engineers (Electrical) N. K. Jain Consulting Engineers
  1002, Kritika Tower, Nr. R. K. Studio, Sion Trombay Road, Chembur, Mumbai – 71
  Value of Contract 1,27,00,000.00
  Stipulated Time 12 Weeks
  Year of Commencement 2008 – 2009
 
54 Details of Client IDFC
    INFRASTRUCTURE DEVELOPMENT FINANCE COMPANY LIMITED.
  Site Address Unit No. 301 to 701, Naman Chambers, Plot No. C- 32, BKC, Mumbai – 51.
  Project Details Electrical Installation & Allied Work
  Project Architect Kamal S. Malik.
  Associated Consulting Engineers (Electrical) Vikas Joshi & Associates.
  Gangadhar Building, Ground Floor, 364 C/D, N.C Kelkar Road, Dadar, Mumbai – 28.
  Value of Contract 79,29,562.00
  Stipulated Time 4 Weeks.
  Year of Commencement 2008 – 2009
 
55 Details of Client INTERLACE INDIA PVT. LTD.
  Site Address IT Park Unit at Sipcot, Siruseri, Chennai
  Project Details Electrical Installation & Allied Work
  Project Architect Design Pundits Interiors Pvt. Ltd.
  72/3, Sri Krupa, Pandurang Wadi Road No. 2, Goregaon (E), Mumbai – 63.
  Associated Consulting Engineers (Electrical) Avinash Raj & Associates.
  Value of Contract 21,34,405.00
  Stipulated Time 6 Weeks
  Year of Commencement 2008 – 2009
 
56 Details of Client NAVTEQ INDIA PVT. LTD.
  Site Address Unit Nos. 305 – 308 (AC), 3rd Floor, Multistored Building, Seepz, MIDC, Andheri (East), Mumbai – 96.
  Project Details Electrical Installation & Allied Work
  Project Management Consultant Cushman & Wakefield.
  1st Floor, Mafatlal House, Padma Bhushan, H.T. Parekh Marg, Churchgate, Mumbai.
  Project Architect M/s. Concept Architectural Services Pvt. Ltd.
  711, Swastik Chambers, Sion – Trombay Road, Chembur, Mumbai 400 071
  Associated Consulting Engineers (Electrical) M/s. Ajit N. Kulkarni
  A/215, Amargian Co-Op Premises Society Limited, L.B.S Marg, Opp S. T Workshop, Khopat, Thane (West), – 400 601.
  Value of Contract Rs : 96,00,000.00
  Stipulated Time 8 Weeks.
  Year of Commencement 2008 – 2009
 
57 Details of Client UNITED STOCK EXCHANGE OF INDIA LIMITED
  Site Address Office No. 6 & 7, 2nd Floor, C – Wing, Laxmi Towers, BKC, Mumbai – 51.
  Project Details Electrical Installation & Allied Work
  Project Architect M/s. Adharshila.
  C-403, Rizvi Nagar, S.V. Road, Santacruz (West), Mumbai – 400 064
  Associated Consulting Engineers (Electrical) N. K. Jain Consulting Engineers
  1002, Kritika Tower, Nr. R. K. Studio, Sion Trombay Road, Chembur, Mumbai – 71
  Value of Contract Rs : 41,45,000.00
  Stipulated Time 8 Weeks.
  Year of Commencement 2009 – 2010
 
58 Details of Client SAP INDIA PVT. LTD.
  Site Address 5th Floor, Platina Tower, Bandra Kurla Complex, Bandra (East) Mumbai.
  Project Details Electrical Installation & Allied Work
  Project Management Consultant CB Richard Ellis South Asia Pvt. Ltd.
  #5, 3rd Floor, Tower C, Laxmi Towers, Bandra Kurla Complex, Bandra (East), Mumbai – 51.
  Project Architect DSP Design Associates Pvt. Ltd.
  5th Floor, Rahimtoola House 7, Homji Street Fort, Mumbai – 400 001.
  Associated Consulting Engineers (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Office No. 116, 1st Floor, Bharat Industrial Estate, L.B.S. Marg, Bhandup (West), Mumbai – 78.
  Value of Contract Rs : 58,00,000.00
  Stipulated Time 8 Weeks.
  Year of Commencement 2009 – 2010
 
59 Details of Client Financial Technologies India Pvt. Ltd.
  Site Address Financial Technology Tower, Suren Road, Chakala, Andheri (East) Mumbai – 400 093.
  Project Details Electrical Installation & Allied Work
  Project Management Consultant Jones LangLasalle Property Consultants (India) Pvt. Ltd.
  Level 13, Express Tower, Nariman Point, Mumbai – 400 021.
  Associated Consulting Engineers (Electrical) N. K. Jain Consulting Engineers.
  1002, Kritika Tower, Nr. R. K. Studio, Sion Trombay Road, Chembur, Mumbai – 71
  Value of Contract Rs : 5,70,00,000.00
  Stipulated Time 12 Weeks.
  Year of Commencement 2009 – 2010
 
60 Details of Client Infrastructure Development  Finance Pvt. Ltd.
  Site Address 7th & 8th Floor, KRM Towers No. 1, Harington Road, Chetpet, Chennai – 31.
  Project Details Electrical Installation & Allied Work
  Project Management Consultant M/s. C B Richard Ellis South Asia Pvt. Ltd.
  9A, 2nd Floor, Tower “C”, Laxmi Tower, Bandra Kurla Complex, Bandra (East), Mumbai  – 400 051
  Associated Consulting Engineers (Electrical) J. G. Consultant
  No. 22 (Old No. 30), Venkatraman Street, T. Nagar, Chennai – 600  017.
  Value of Contract Rs : 79,08,092.00
  Stipulated Time 12 Weeks.
  Year of Commencement 2009 – 2010
 
61 Details of Client Morgan Stanley Advantage Services Pvt. Ltd.
  Site Address 4th Floor, Nirlon Knowledge Park, Goregaon (East).
  Project Details Electrical Installation & Allied Work
  Project Management Consultant M/s. Cushman & Wakefield (India) Pvt. Ltd.
  Ground Floor, Mafatlal House, Padma Bhushan, H.T. Parekh Marg, Churchgate, Mumbai.
  Associated Consulting Engineers (Electrical) Project Engineering Services.
  A3/A4, Green Park, Yari Road, Versova, Andheri (West), Mumbai – 061.
  Value of Contract Rs : 1,97,95,441.00
  Stipulated Time 8 Weeks.
  Year of Commencement 2009 – 2010
 
62 Details of Client Perfect Business Centre Services Pvt. Ltd.
  Site Address I Labs Dome, Plot No. 18, Hi-Tech City, Madhapur, Hyderabad – 500 081
  Project Details Electrical Installation & Allied Work
  Project Management Consultant M/s. Indrajit Maitra Associates.
  H-1445, Chitranjan Park, New Delhi – 110  019
  Associated Consulting Engineers (Electrical) M/s. Air Treatment Engineering Pvt. Ltd.
  L-6, 2nd West Street, Thiruvanmiyur, Chennai.
  Value of Contract Rs : 72,80,000.00
  Stipulated Time 8 Weeks.
  Year of Commencement 2009 – 2010
 
63 Details of Client SEARCE LOGISTICS ANALYTICS LLP.
  Site Address 6th Floor, IT – 6, Survey # 154/6, Flagship Infrastructure Pvt. Ltd. Rajiv Gandhi Infotech Park, Phase I, Hinjewadi, Pune – 411 057.
  Project Details Electrical Installation & Allied Work
  Project Consultant (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S. Marg, Bhandup (West), Mumbai – 78.
  Value of Contract Rs : 1,15,00,000.00
  Stipulated Time 8 Weeks.
  Year of Commencement 2011 – 2012.
 
64 Details of Client KARROX – (ARRINA EDUCATION SERVICES PVT . LTD.
  Site Address Unit No. 201 A/1, Raheja Plaza, A Wing, 2nd Floor, Ghatkopar (West), Mumbai – 400 086.
  Project Details Electrical Installation & Allied Work
  Project Management Consultant M/s. Vijay Punjabi Consultants Pvt. Ltd.
  368, Shantikamal, V. P. Road, Santacruz (West), Mumbai – 400 055.
  Associated Consulting Engineers (Electrical) M/s. Avinash Raj & Associate.
  Unit No. 4, Shipoy Building, 124, Mathuradas Mill Compound, Senapati Bapat Marg, Lower Parel, Mumbai – 13.
  Value of Contract Rs : 12,37,630.00
  Stipulated Time 4 Weeks
  Year of Commencement 2012 – 2013
 
65 Details of Client GANJAM TRADING COMPANY PVT. LTD.
  Site Address New Prakash Cinema Building, N. M. Jsohi Marg, Lower Parel, Mumbai – 400 011.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 1,29,75,000.00
  Stipulated Time 8 Weeks
  Year of Commencement 2012 – 2013
 
66 Details of Client VOLTAS LTD.
  Site Address Nagar Road, Pune.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Avinash Raj & Associates.
  Value of Contract Rs : 30,37,928.00
  Stipulated Time 6 Weeks
  Year of Commencement 2012 – 2013.
 
67 Details of Client KONECRANES SHARED SERVICES (I) PVT. LTD.
  Site Address Unit 2, Level 2, Wing B, Tower IX, Magarpatta City SEZ, Hadapsar, Pune – 411 013.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 74,77,152.00
  Stipulated Time 8 Weeks
  Year of Commencement 2012 – 2013.
 
68 Details of Client GIVAUDAN INDIA PVT. LTD.
  Site Address R&D Lab at Akruti Center Point, MIDC Central Road, Andheri (East), Mumbai.
  Project Details Electrical Installation & Allied Work
  Project Management Consultant Jones LangLasalle Property Consultants (India) Pvt. Ltd.
  Associated Consulting Engineers (Electrical) R. H. Rangwala Consulting Engineer.
  Value of Contract Rs : 1,13,81,051.00
  Stipulated Time 8 Weeks
  Year of Commencement 2012 – 2013
 
69 Details of Client MILAP ESTATE PVT. LTD.
  Site Address S. V. Road, Kandivali (West), Mumbai – 67.
  Project Details Electrical Installation & Allied Work
Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 68,39,387.00
  Stipulated Time 8 Weeks
  Year of Commencement 2012 – 2013.
 
70 Details of Client TATA AIA
  Site Address 14th Floor, Peninsula Business Park, Tower A, Lower Parel, Mumbai.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) N. K. Jain Consulting Engineers.
  Associated Architect Sankalpan Architects Pvt. Ltd.
  Value of Contract Rs : 90,00,000.00
  Stipulated Time 8 Weeks
  Year of Commencement 2012 – 2013.
 
71 Details of Client DAIWA CAPITAL MARKETS INDIA PVT. LTD.
  Site Address 3rd North Avenue, 10th Floor, Maker Maxity, Kalanagar, BKC, Bandra (East), Mumbai – 51
  Project Details Electrical Installation & Allied Work
  Project Management Consultant CBRE South Asia Pvt. Ltd.
  Associated Consulting Engineers (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Associated Architect Rajshekar & Associates.
  Value of Contract Rs : 35,11,551.00
  Stipulated Time 8 Weeks
  Year of Commencement 2012 – 2013
 
72 Details of Client TATA AIG
  Site Address 15th Floor, Peninsula Business Park, Tower A, Lower Parel, Mumbai.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Trainon Consulting Solutions Pvt. Ltd.
  Associated Architect JTCPL, Mumbai.
  Value of Contract Rs : 1,01,88,011.00
  Stipulated Time 12 Weeks
  Year of Commencement 2012 – 2013
 
73 Details of Client GeP SOLUTIONS PVT. LTD.
  Site Address 4th Floor, Bldg No. 3, Plot No. 3, Mindspace SEZ, TTC Industrial Area, MIDC, Thane – Belapur Road, Airoli, Navi Mumbai 400 708.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Associated Architect Ten Creative Studio
  Value of Contract Rs : 56,00,000.00
  Stipulated Time 12 Weeks
  Year of Commencement 2012 – 2013
 
74 Details of Client THE JAMMU & KASHMIR BANK LIMITED.
  Site Address Ackruti Gold, Bandra Kurla Complex, Mumbai.
  Project Details Electrical Installation & Allied work
  Associated Consulting Engineers (Electrical) Surmount
  Architect Ratan J Batlibhoi.
  Value of Contract Rs : 3,68,40,202.00
  Stipulated Time 12 Months.
  Year of Commencement 2011 – 2012
 
75 Details of Client ENCUBE ETHICALS PVT. LTD.
  Site Address Extension of Existing Ointment Facility at Goa.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) M/s. M. J. Associates.
  Value of Contract Rs : 1,48,37,998.00
  Stipulated Time 10 Weeks
  Year of Commencement 2012 – 2013.
 
76 Details of Client CYBERTECH SYSTEMS & SOFTWARE LTD.
  Site Address Cybertech House, Plot No. B-63/64/65, Road # 21/34, J.B. Sawant Marg, MIDC, Wagle Estate,Thane – 400 604.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 93,75,000.00
  Stipulated Time 12 Weeks
  Year of Commencement 2012 – 2013.
 
77 Details of Client GLENCORE GRAIN INDIA PVT. LTD.
  Site Address Cnergy, 4th Floor, Prabhadevi, Mumbai.
  Project Details Electrical Installation & Allied Work.
  Associated Consulting Engineers (Electrical) M/s. Design Technics.

308, Balaji Industrial Estate Co-op, Hsg, Soc Ltd.

Bldg No. 9, Jogani Industrial Complex, Sion – Chunabhatti (East), Mumbai – 22.

  Associated Architect M/s. DSP Design Associate Pvt. Ltd.
  Value of Contract Rs : 54,00,000.00
  Stipulated Time 8 Weeks
  Year of Commencement 2012-2013
 
78 Details of Client VOLTAS LTD.
  Site Address Shalimar Corporate Park, Gomtinagar, Lucknow.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) M/s. Avinash Raj & Associates.
  Associated Architect M/s. Vijay Punjabi Consultant Pvt. Ltd.
  Value of Contract Rs : 29,45,918.00
  Stipulated Time 12 Weeks.
  Year of Commencement 2013 – 2014
 
79 Details of Client K HEMANI
  Site Address Trade Center, BKC.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 38,06,854.00
  Stipulated Time 8 Weeks
  Year of Commencement 2013 – 2014
   
80 Details of Client CIPLA LTD.
  Site Address Tower A, Peninsula Business Park, Lower Parel.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers Avinash Raj & Associates.
  Value of Contract Rs : 1,02,52,249.00
  Stipulated Time 8 Weeks
  Year of Commencement 2013 – 2014
 
81 Details of Client THE NATIONAL SPORTS CLUB OF INDIA.
  Site Address Lala Lajpatrai Marg, Worli, Mumbai – 400 018.
  Project Details Electrical Installation & Allied Work
  Architect Engineers Shashi Prabhu & Associates.
  Value of Contract Rs : 1,89,00,000.00
  Stipulated Time 6 Weeks.
  Year of Commencement 2011 – 2012.
 
82 Details of Client K RAHEJA PRIME.
  Site Address Marol, Andheri (East), Mumbai.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 48,00,000.00
  Stipulated Time 8 Weeks
  Year of Commencement 2013 – 2014.
 
83 Details of Client SYNGENTA SERVICES PVT. LTD.
  Site Address Amar Paradigm S. No.110/113, Baner Road, Pune 411 045, Maharashtra,
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 40,50,000.00
  Stipulated Time 8 Weeks
  Year of Commencement 2013 – 2014.
 
84 Details of Client NATIONAL STOCK EXCHANGE OF INDIA LIMITED.
  Site Address 4th Floor, Jeevan Vihar, Sansad Marg, New Delhi.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Core Group
  Value of Contract Rs : 17,15,767.00
  Stipulated Time 4Weeks
  Year of Commencement 2013 – 2014.
 
85 Details of Client BENCHMARK ENGINEERING PVT. LTD. – (A/c. KONECRANES SHARED SERVICES PVT. LTD.)
  Site Address Level 2, Wing B, Tower 9, Magarpatta, Pune.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 4,55,307.00
  Stipulated Time 8 Weeks
  Year of Commencement 2013 – 2014.
 
86 Details of Client VIJAY PUNJABI CONSULTANTS PVT. LTD. – (A/C. DTZ INTERNATIONAL PROPERTY ADVISORS PVT. LTD.)
  Site Address 4th Floor, B Wing, The Capital Building, Behind ICICI Bank, BKC, Bandra (East),
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Vijay Punjabi Consultants Pvt. Ltd.
  Value of Contract Rs : 14,72,517.00
  Stipulated Time 4 Weeks
  Year of Commencement 2013 – 2014.
 
87 Details of Client BARCLAYS BANK PLC.
  Site Address B6, Level 9, NKP, Goregaon East.
  Project Details Electrical Installation & Allied Work
  Associated Project Management Consultant. Jones Lang Lasalle.
  Associated Consulting Engineers (Electrical) Project Engineering Services.
  Value of Contract Rs : 1,34,73,577.00
  Stipulated Time 12 Weeks
  Year of Commencement 2013 – 2014.
 
88 Details of Client GENEXT HARDWARE & PARKS PVT. LTD.
  Site Address Vivarea Club House, Hindustan Mills, Mahalaxmi, Mumbai.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Frischmann Prabhu (I) Pvt. Ltd.
  Associated Architect Atul Desai & Architect
  Value of Contract Rs : 58,85,844.00
  Stipulated Time 8 Weeks
  Year of Commencement 2012 – 2013.
 
89 Details of Client Forum Group
  Site Address Unit No. 102, Peninsula Business Park, Tower B, Lower Parel, Mumbai.
  Project Details Electrical, Networking & UPS Work.
  Associated Project Management Consultant. Jones LangLasalle
  Associated Consulting Engineers (Electrical) Design Technics
  Value of Contract Rs : 22,08,188.00
  Stipulated Time 8 Weeks
  Year of Commencement 2014-2015.
 
90 Details of Client TATA AIA A/c – Benchmark Engineering Pvt. Ltd.
  Site Address I-Think Technomount Campus, Thane.
  Project Details Electrical Installation & Allied Work
  Associated Project Management Consultant. AMs Project Consultant Pvt. Ltd.
  Associated Consulting Engineers (Electrical) N. K. Jain Consulting Engineers.
  Associated Architect (Electrical) Sankalpan
  Value of Contract Rs : 1,09,53,853.00
  Stipulated Time 12 Weeks
  Year of Commencement 2014-2015.
 
91 Details of Client GIA INDIA LABORATORIES INDIA PVT. LTD.
  Site Address 10th Floor, Trade Center, CTS No. 4207, Village Kolekalyan at Bandra (East), Mumbai.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 1,64,57,844.00
  Stipulated Time 8 Weeks
  Year of Commencement 2014 – 2015.
 
92 Details of Client IDFC LIMITED.
  Site Address Basement, Ground, 1st & 8th Floor, Naman Chambers, Bandra (East), Mumbai.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Electro -Mech Consultants.
  Value of Contract Rs : 1,31,74,935.00
  Stipulated Time 8 Weeks
  Year of Commencement 2014 – 2015.
 
93 Details of Client ERNST & YOUNG SERVICES PVT. LTD.
  Site Address 6th & 7th Floor, Tidel Park, Chennai.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Suyog Consultants – Bengaluru.
  Value of Contract Rs : 66,18,467.00
  Stipulated Time 8 Weeks
  Year of Commencement 2014 – 2015.
 
94 Details of Client GENERAL MILLS INDIA PVT. LTD.
  Site Address Spectra, 6th Floor, Hiranandani Business Park, Powai, Mumbai – 76.
  Project Details Electrical Installation & Allied Work
  Associated Project Management Consultant. Jones Lang Lasalle.
  Associated Consultant IBS Gulf Design Pvt. Ltd.
  Value of Contract Rs : 1,38,79,289.00
  Stipulated Time 12 Weeks
  Year of Commencement 2014-2015.
 
95 Details of Client SCHLUMBERGER – (K RAHEJA)
  Site Address Commer Zone ; Building 4 ; Level 7
  Project Details Electrical Installation & Allied Work
  Associated Project Management Consultant. Jones Lang Lasalle.
  Associated Consultant Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 73,25,000.00
  Stipulated Time 8 Weeks
  Year of Commencement 2014-2015.
 
96 Details of Client Willis Processing Services (India) Pvt. Ltd.
  Site Address Plot No. 6, Godrej & Boyce Mfg. Co. L.B.S. Marg, Vikhroli (West), Mumbai, Maharashtra 400 079.
  Project Details Electrical Installation & Allied work.
  Associated Project Management Consultant. Jones LangLasalle
  Associated Architect MMoser Architect
  Associated Consultant Ajit N. Kulkarni.
  Value of Contract Rs : 2,17,87,711.00
  Stipulated Time 12 Weeks
  Year of Commencement 2014-2015.
 
97 Details of Client Merck India
  Site Address Plot No. 6, Godrej & Boyce Mfg. Co. L.B.S. Marg, Vikhroli (West), Mumbai, Maharashtra 400 079.
  Project Details Electrical Installation & Allied work.
  Associated Project Management Consultant. Jones LangLasalle
  Associated Consultant Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 84,00,000.00
  Stipulated Time 12 Weeks
  Year of Commencement 2014-2015.
 
98 Details of Client PFIZER LIMITED.
  Site Address 18th & 19th Floor, The Capital, BKC, Mumbai.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Interics Design Consultants.
  Value of Contract Rs : 3,31,42,799.00
  Stipulated Time 8 Weeks
  Year of Commencement 2014 – 2015.
 
99 Details of Client VOLTAS LIMITED.
  Site Address Chinchpokli, Mumbai.
  Project Details Electrical Installation & Allied Work
  Associated Project Management Consultant. Jones Lang Lasalle.
  Associated Architect VPCPL Architect.
  Value of Contract Rs : 63,50,000.00
  Stipulated Time 8 Weeks
  Year of Commencement 2014-2015.
 
100 Details of Client GIA India Laboratories (P) Ltd.
  Site Address 5th Floor, Trade Center, CTS No. 4207, Village Kolekalyan at Bandra (East), Mumbai.
  Project Details Electrical Installation & Allied Work, for GIA Laboratories at BKC.
  Associated Consulting Engineers (Electrical) M/s. Cutech Consulting Engineers Pvt. Ltd.
  Bharat Industrial Estate, Office No. 116, 1st Floor, L.B.S Marg, Bhandup (West), Mumbai – 400 078.
  Value of Contract Rs : 50,76,761.00
  Stipulated Time 8 Weeks
  Year of Commencement 2014-2015.
 
101 Details of Client D DÉCOR HOME FABRICS PVT. LTD.
  Site Address 1071/1072, Solitaire Corporate Park, Building No. 10, 167, Guru Hargovindji Marg, Chakala, Andheri (East), Mumbai – 93.
  Project Details Electrical Installation & Allied Work
  Associated Consulting Engineers (Electrical) Parthenon Architects
  Value of Contract Rs : 1,00,70,190.00
  Stipulated Time 12 Weeks
  Year of Commencement 2014 – 2015.
 
102 Details of Client DELIGHT FOOD.
  Site Address Taloja.
  Project Details Electrical Installation & Allied Work
  Associated Architect (Electrical) Ajit N. Kulkarni.
  Value of Contract Rs : 57,51,943.00
  Stipulated Time 12 Weeks
  Year of Commencement 2014-2015.
 
  103 Details of Client IDFC Limited.
  Site Address 7th & 8th Floor, Gigaplex – Building 01, MIDC Airoli, Navi Mumbai.
  Project Details Electrical Installation & Allied work.
  Associated Project Management Consultant. Jones LangLasalle
  Associated Architect JTCPL
  Associated Consultant Ajit Kulkarni Consultants Pvt. Ltd.
  Value of Contract Rs : 2,10,75,000.00
  Stipulated Time 4 Weeks.
  Year of Commencement 2015-2016.
 
104 Details of Client Virtela India Pvt. Ltd.
  Site Address Level 11, B4/B5, Nirlon Knowledge Park, Goregaon.
  Project Details Electrical Installation & Allied work.
  Associated Project Management Consultant. Jones LangLasalle.
  Associated Architect DWP Interics.
  Associated Consultant Cutech Consulting Engineers Pvt. Ltd.
  Value of Contract Rs : 1,57,00,000.00
  Stipulated Time 12 Weeks
  Year of Commencement 2015-2016.
 
105 Details of Client Crompton Greaves Limited.
  Site Address Kanjur East, Mumbai.
  Project Details Electrical Installation & Allied work.
  Associated Consultant Mr. Uday Batwal.
  Value of Contract Rs : 3,78,14,766.00
  Stipulated Time 4 Months
  Year of Commencement 2015-2016.
 
106 Details of Client Birla Aurora
  Site Address 9th Floor, Century Bhavan, Dr. Annie Besant Road, Century Bazaar, Worli, Mumbai.
  Project Details Electrical Installation & Allied work.
  Associated PMC Jones LangLasalle.
  Associated Architect P. G. Patki Architect.
  Associated Consultant Varun Hydrotech Consultants Pvt. Ltd. – Thane
  Value of Contract Rs : 17,73,831.00
  Stipulated Time 30 Days.
  Year of Commencement 2016-2017.
 
107 Details of Client General Mills India Pvt. Ltd.
  Site Address Level 5, Spectra Building, Hiranandani Business Park, Powai.
  Project Details Electrical Installation & Allied work.
  Associated PMC Jones LangLasalle.
  Associated Architect Architecture Interior.
  Associated Consultant Darshika Consultants Pvt. Ltd. – Bangalore.
  Value of Contract Rs : 1,46,00,000.00
  Stipulated Time 50 Days.
  Year of Commencement 2016-2017.
 
108 Details of Client Idea Cellular Limited.
  Site Address Greenspan Century, 9th to 12th Floor, Worli.
  Project Details Electrical Installation & Allied work.
  Associated PMC Jones LangLasalle.
  Associated Architect Sankalpan Architect.
  Associated Consultant R H Rangawala.
  Value of Contract Rs : 2,31,50,554.00
  Stipulated Time 70 Days.
  Year of Commencement 2016-2017.
 
109 Details of Client Modern Informatics Pvt. Ltd.
  Site Address @ 3rd Floor, Rupa Solitaire, Mahape, Navi Mumbai.
  Project Details Electrical Installation & Allied work.
  Associated PMC Eminence Infraventures.
  Associated Consultant Darshika Consultants Pvt. Ltd.
  Value of Contract Rs : 54,00,000.00
  Stipulated Time 4 Months
  Year of Commencement 2016-2017.
 
110 Details of Client Schlumberger India Technology Centre Private Limited.
  Site Address  Commerzone, Pune
  Project Details Electrical Installation & Allied work.
  Associated PMC
Colliers International Property (I) Pvt Ltd.
  Associated Architect Edifice Consultants Pvt Ltd.
  Associated Consulting Engineers (Electrical) Ubteh Consulting Engineers
  Value of Contract Rs : 1,04,00,000.00
  Stipulated Time 8 Weeks
  Year of Commencement 2016-2017.
 
111 Details of Client Sony Pictures Networks India Pvt. Ltd.
  Site Address 2nd floor, Interface Building no 7, Off Malad Link Road, Malad West, Mumbai – 400064
  Project Details Electrical Installation & Allied work.
  Associated PMC Jones Lang Lasalle.
  Associated Architect Alcove Design
  Associated Consultant Maars Tech Engineers Pvt Ltd.
  Value of Contract Rs : 3,55,00,000.00
  Stipulated Time 4 Months
  Year of Commencement 2016-2017.
 
112 Details of Client Western Union.
  Site Address Podium Level, Business Bay, Airport Road, Yerwada, Pune.
  Project Details Electrical Installation & Allied work.
  Associated PMC M/s. Knight Frank Property Services Pvt. Ltd.
  Associated Consultant M/s. Ubtech Consulting Engineers Pvt. Ltd.
  Associated Architect M/s. dWP Interics.
  Value of Contract Rs : 4,20,00,000.00
  Stipulated Time 12 Weeks
  Year of Commencement 2017-2018.
 
113 Details of Client Glaxo Smith Kline – GSK – Worli
  Site Address GSK House 252, Dr. Annie Besant Road, Near to Doordarshan, Worli, Mumbai – 400030, India
  Project Details Electrical Installation & Allied work.
  Associated Consultant M/s. Interics Design Consultant
  Value of Contract Rs : 4,95,00,000.00
  Stipulated Time 12 Months
  Year of Commencement 2018-2019.